Skip to content
Calculators & guides

Concrete Bag Calculator

Find how many 40, 60 or 80 lb premix bags you need for small slabs, pads, posts and repairs.

Project type

Units

Geometry dimensions — schematic, not to scaleL (length)HW
Schematic · not to scale · quantity repeats the entire solid

Concrete & bag assumptions

Density is the placed concrete density, not dry bag weight. Defaults are examples for normal-weight concrete. Bag weight does not determine yield; use the mixed yield printed on your product.

Estimate cost (optional · USD)

All cost fields are optional and user-entered. Ready-mix and bags are alternatives, never added together. No average or local prices are assumed — use a real quote. Labor per area is available only for shapes with a defined footprint.

Formula & solid model

V = L × W × H × Q

All lengths convert to metres before calculation. Blank waste = 0%. Zero dimensions or quantity produce zero volume. Display values are rounded; costs and bags use unrounded volumes.

Rectangular slab · incl. 10% waste

You need approximately 1.358 cubic yards

36.667 ft³ · 1.038 m³ · 1,038.28 litres

Volume

UnitExact+10% waste
Cubic yards1.2351.358
Cubic feet33.33336.667
Cubic metres0.9441.038
Litres943.8951,038.284

Placed weight · incl. waste

5,500 lb / 2,494.76 kg

Density: 150 lb/ft³ · weight = volume × density

Selected premix bags · incl. waste

62 × 80 lb bags

Yield: 0.6 ft³ / bag · total volume ÷ yield, rounded up.

Above about 1 yd³, ready-mix is often more practical than mixing bags.

Estimate inputs & formula

Length: 10 ft · Width: 10 ft · Thickness (H): 4 in · Quantity (Q): 1

V = L × W × H × Q

Estimate only, not engineering advice. Actual needs vary with subgrade, forms and spillage. Confirm final quantities and product yields with your supplier or contractor before ordering.

What this calculates

Bagged premix is convenient for small jobs. This tool converts your project volume into a whole number of bags for the selected size and editable product yield, rounding up so you are not short.

Preset yields are examples, not universal specifications. Enter the mixed yield on your product label; bag weight alone does not establish yield.

Formula

Bags = total volume (cu ft) ÷ bag yield (cu ft), rounded up

Typical yields: 40 lb ≈ 0.30 cu ft · 60 lb ≈ 0.45 cu ft · 80 lb ≈ 0.60 cu ft

Worked example

4 × 4 ft pad, 4 in thick

  1. 1.4 × 4 × 0.333 = 5.33 cu ft
  2. 2.Add 10% waste: 5.87 cu ft
  3. 3.80 lb: 5.87 ÷ 0.60 = 9.8 → 10 bags · 60 lb: 14 bags · 40 lb: 20 bags

Common mistakes

  • Assuming every brand yields the same — fast-setting and high-strength mixes can differ.
  • Using bags for large pours. Above roughly a cubic yard, mixing 45+ bags by hand is slow and ready-mix is usually more practical.
  • Forgetting water, a mixer and enough helpers to place the concrete before it sets.

Frequently asked questions

How many 80 lb bags make a cubic yard?

At about 0.60 cu ft per bag, one cubic yard (27 cu ft) takes 45 bags of 80 lb premix.

How many 60 lb bags make a cubic yard?

At roughly 0.45 cu ft per bag, a cubic yard takes about 60 bags of 60 lb premix.

Is it cheaper to use bags or ready-mix?

For very small jobs bags usually win. For larger pours, ready-mix tends to be cheaper per yard, though delivery minimums and short-load fees apply. Compare quotes with the cost calculator.